Trumeter Knowledge Base
  • Home
  • Counters & Timers
  • IoT & Cloud
  • APM
  • Distance
  • Length
  • Vista Touch
  • Contact
  • Contact

FAQ

  • Can I connect more than one APM to my computer and program them all at the same time?
  • Wire the Digital Output to a Relay
  • What does "Display Peak Bar" and "Peak Hold" do?
  • What is the nominal impedance of the Amp Meter?
  • Will the APM output turn on a warning light?
  • APM Calibration
  • What is the sink capacity of the digital outputs?
  • Understanding the APM Power Meter Totalizer
  • What does the "Limit Decimal Places" function do?
  • What is the default backlight color?
  • Is the APM UL listed?
  • How many times can I change the configuration?
  • What holds the APM in a panel?
  • What is the size of the panel hole needed for the APM?
  • Is the APM environmentally rated?
  • What is the maximum cable size for screw terminals?
  • What is the comparable DIN size?
  • Is the APM CE marked?
  • Does the APM meet the requirements of RoHS?
  • How much does an APM weigh?
  • 1
  • 2
  • 3

Categories

  • Amp Meter
  • APM MAX
  • APM Power Meter
  • Choosing the Right APM
  • Configuration
  • CT Meter
  • Display
  • FAQ
  • Inputs
  • M1 & M2 Meter
  • Mounting & Environment
  • Outputs
  • Power Supply
  • Process Meter
  • Shunt Meter
  • Software
  • Temperature Meter
  • Troubleshooting
  • Volt Meter
  • Wiring
No results found

© Trumeter 2025. Powered by Help Scout